Prime Power, VBC West, Iraq

VBC West was the first Prime Power site awarded to Arkel in October 2007. Arkel was responsible for all design and installation of the entire plant, as well as the design and construction of the main power site. There was also a requirement of 12 Kilometers of 11KV overhead network and 21 HV substations.

This project also included the temporary construction camps for 60 personnel, the permanent RLB site camp for 30+ people, leveling of site, all fencing, roads, complete project engineering, supply of fueling system, fuel unloading system, fuel system instrumentation and controls, fuel polishing system, fuel storage for up to 200,000 gallons, fuel containment system, generator foundations, pole foundations, pole erection, transformer foundations, transformer placement, transformer procurement, wire procurement, wire installation, electrical control loops for power generation, fuel supply loops for generators, generator foundations, internal wiring and grounding for generators, supply of workshops and procurement of maintenance equipment.